MAINTelligence Pilot Project CARMEUSE

Client: CARMEUSE

Pilot project objective was the implementation of Computerized Maintenance Management System (CMMS) and Operator Driven Reliability (ODR) modules. LUDAN scope: Database Construction, Asset Management within the CMMS module, Equipment inspection routes including temperature, vibration measurements, visual inspections, check-lists, Work flow management process, Data processing and analysis, Relevant reports, KPIs.Pilot project objective was the implementation of Computerized Maintenance Management System (CMMS) and Operator Driven Reliability (ODR) modules. LUDAN scope: Database Construction, Asset Management within the CMMS module, Equipment inspection routes including temperature, vibration measurements, visual inspections, check-lists, Work flow management process, Data processing and analysis, Relevant reports, KPIs.


^

Data Cleansing ROMPETROL

Client: ROMINSERV

After a brief analysis of existing MRO materials (maintenance, repair and operations) database (performed by 3rd party company), the client (ROMINSERV) concluded that is needed an optimization it's own MRO materials Master data in order to obtain structured, accurate and accessible product information - “Item Master Clean-Up”. Major Objectives: develop a rationalized Inventory cataloguing strategy and procedures implementation; review, create and update an effective catalogue to manage the Stock Item Master more effectively and efficient nationalized Material Master that will be an effective tool for Maintenance, Purchase and Logistics Management; uniform coding structure of the Item Master; controlled items creation and obsolescence; aligned approach for Item Master maintenance, including Items Coding and Naming conventions, Item Creation and Item Obsolescence procedures; enrichment of BOM for critical equipment; MRO (Maintenance, Repair & Operation) spare parts optimization.


^

Computerized Maintenance Management System Implementation

Client: AZOMURES S.A.

LUDAN was awarded with a contract for Computerized Maintenance Management System implementation - IBM MAXIMO software. Scope of work consist in: Technical and functional solution design, Work Management, Asset Management, KPIs, Reports, Materials Management interface with SAP, Interface with Oracle Primavera Interface with SKF Decision Support; training.


^

PI OSIsoft implementation - Smart CANDU System

Client NUCLEARELECTRICA

LUDAN scope of work:  implementation of PI 2012 HA; configuration of OPC redundant interfaces; installation and configuration of  PI to PI interfaces.


^

Upgrade  and Implementation of Maximo Asset Management ROMPETROL

Client: ROMINSERV

LUDAN scope : technical and functional solution design, implementation of: Work Management, Procurement, Asset Management, Materials Management, Contract Management, KPIs, Reports; Interfaces with Oracle ERP and OsiSoft PI, Trainings.


^

Implementation of OSISoft Plant Information LUKOIL

Client: PETROTEL - LUKOIL

Project objective : Upgrading the existing Plant Information system  to a new version in High Availability configuration, aligning the Plant Information suite to the new IT standards and to permit Lukoil to access the new Plant Information product suite, that were not previously available. The purpose of updating PI system consist in: Updating the existing software and hardware systems  Ensuring continuity of the existing database and its extension; Ensuring the tags, equipment and other means – object grouping in order to facilitate the activities related to the pre-definition of performance indicators KPI; Profit growing trough technological process functioning and optimization of energy consumption as a result of predefined KPIs online monitoring; Importing of functions and software licenses/applications of the existing system in the frame of the new platform Reduce the risk of losing existing database.


^

Upgrade PI System ROMPETROL

Client: ROMPETROL

The objective : Upgrade PI System in Petromidia Refinery; Analysis Framework pilot implementation.
LUDAN services: Upgrade PI to version 2012 in High Availability configuration; Upgrade PI interfaces and reconfiguration for redundancy;Upgrade custom interfaces;PI Analysis Framework implementation pilot.


^

Implementation  PI System INA REFINERY

Client: INA REFINERY

Ludan implemented  PI system including  Asset Framework (AF), AF-Explorer, AF-Modeler and others.


^

Process Information & Data Reconciliation System ROMPETROL

Client: ROMPETROL

Project objective: supply, application design, installation, implementation and commissioning of plant wide information system based on PI System and SigmaFine software package.  The project included integration of the information system with the main DCS system as well as with several refinery locally dedicated control systems of different vendors. Ongoing technical support since project acceptance.

Scope of work:Plant Information System & Implementation, Data Reconciliation System Supply & Development, Ongoing Technical Support


^

MAINTelligence Pilot Project for WIENEBERGER

Client: WIENERBERGER

The objective was  the health  monitoring  of some equipment located in Wienerberger Triteni Plant, including vibration, temperature measurements and visual inspections. LUDAN scope: Database construction; Equipment inspection routes including temperature, vibration measurements; Work flow management process; Data processing and analysis; Relevant reports, KPIs.